Interior gut and rebuild — planned so you know what happens each week and, more importantly, when you get your house back.

The approach

A gut renovation is a
logistics problem.

Grant G. described his project as an interior gut and remodel — a huge job — and said everything turned out incredible. Sue K., on a similar scope, talked about an eye for detail and a strong work ethic. Both were describing the same thing from different angles: a large project that stayed under control.

That is what a whole-home renovation actually demands. The construction techniques are not exotic. What is hard is sequencing twelve trades through one building, in the right order, without any of them undoing the last one's work — while the client still has a life to live around it.

So we plan the phasing before we plan anything else. Which rooms come offline when, what the critical path is, where the long-lead items sit, and what your realistic move-back date is. Then we hold to it, and tell you early when something threatens it.

Licensed CSLB #1049743 · Bonded & insured

Contemporary dark kitchen with island after renovation
Bright remodelled kitchen with island and custom cabinetry
What is included

Everything this
work involves.

One licence covers all of it. You are not appointing six separate trades and refereeing between them.

Full interior strip-out

Back to structure where it is warranted, with what is behind the walls assessed rather than assumed.

Structural alterations

Wall removal, new beams and load paths to open up a plan that was drawn for a different era of living.

Complete re-services

Plumbing, electrical and HVAC brought up to current code and specified for how the house will actually be used.

Kitchens and bathrooms

The two rooms that dominate a renovation budget, handled to the same standard as our standalone remodels.

Flooring, painting and lighting

Continuous flooring, proper paint preparation, and a lighting design that suits the reworked plan.

Phasing and programme

A week-by-week plan of what happens where, so you can arrange your life around the build with confidence.

How it runs

Four stages,
no surprises.

You will always know which stage you are in and what happens next.

01

Survey and phasing plan

We assess the whole building, then build the programme around the critical path and your realistic move-back date.

02

Strip-out and structure

Demolition, then structural alterations and any remedial work the strip-out reveals.

03

Services and dry-in

Plumbing, electrical and HVAC through the whole house, inspected, then insulation and drywall.

04

Fit-out and handover

Kitchens, bathrooms, joinery, flooring, lighting and paint, then a full-house punch list walked together.

Selected work

Work of this kind.

Ask us for photographs and references from recent projects near you — we will send them over.

In their words

Clients on this
kind of project.

Published reviews from real clients, filtered to this service. See all reviews.

4.2
Based on 5 published client reviews
Read all reviews
Questions

Straight answers.

Most run five to twelve months on site depending on square footage, how much structural work is involved, and whether the services are being fully replaced. Permitting and long-lead items sit on top of that. We give you a phased programme rather than a single optimistic date.

For a full gut, usually yes — the house has no working services for a period. For a phased renovation where we take the property zone by zone, many clients stay. We will tell you honestly which your scope requires.

By sequencing it properly and by having the owner on site rather than managing it from a distance. Most large-project failures are coordination failures, and coordination is not something you can delegate to a spreadsheet.

On a house of any age you should expect some. Old wiring, failed waterproofing, rot, or framing that was never right. Every one is raised with you, priced in writing, and agreed before the work is done.

Yes, and we do regularly. We can also help align an early scheme with a realistic budget, which is usually a better use of everyone's time than fully detailing something that cannot be built for the money available.

Related

Often combined with.

Most projects touch more than one of these. See all services.

Bright remodelled kitchen with island and custom cabinetry

Kitchen Remodeling

Layout, cabinetry, stone, plumbing, electrical and lighting handled as a single package — so the trades stop blaming each other.

Explore service

Modern custom home exterior with clean rooflines

Custom Home Building

Ground-up construction on your lot, run by the licensed builder who priced it — not handed to a project manager you have never met.

Explore service

Free, no-obligation

Tell us about the project.

Send the details, or just call. You will speak to Russell — the person who will price the work and run it.

Call Now WhatsApp